PROJECT DATA
Production :
35,000-40,000 tpm(ramp up to 70K tpm)
Mining Method :
Open Pit
Neighboring Assets :
PT Pratama Bersama (“PB”)
More than 4,000 ha and exploration drilling ongoing. Target production in 1st quarter 2018.
Same strike with same quality as BOS (High CV Coal) and will utilize the existing infrastructure
Hauling Distance :
1.3km to stockpile facility and 2.0 km from stockpile to the jetty